

2015
Edmunds, Maine
Owner
Engineer
Redi-Rock limestone faced MSE Wall
Maine DOT
TranSystems
Lane Construction Corp.
Contractor
Span
Rise
Width
Skew
Headwall
About
Composite Superstructure
Headquarters Cheshire, CT
56’
11’
46′
23º
The Tide Mill 2 Bridge Replacement was a detail build project, giving AIT the opportunity to meet the given parameters Matches the AIT’s longest span project
13 carbon fiber tubes 4′-2 1/2″ spacing 15″ diameter
Tide Mill 2 Bridge