2020
Hampden, ME
Owner
Engineer
MaineDOT
AIT Bridges
Brewer, ME
T. Buck
Contractor
Span
Rise
Width
Skew
Headwall
About
Composite Superstructure
Auburn, ME
75'
40'-4"
15º
AIT Bridges' first GBeam bridge, all girders were manufactured at AIT Bridges' manufacturing warehouse in Brewer, ME.
5 tub GBeams with a width of 3'-10" and a height of 4'-2", alternating carbon and glass in the bottom and top flanges.
Grist Mill Bridge
We've seen some composite girders, but they're all filled with concrete. The weight is always a factor, the speed in which we can move them around and manipulate them, spin them, hold them, is very simple because of the weight.
-Brian Emmons, Project Manager, T. Buck
Grist Mill Bridge