2010
Hermon, Maine
Owner
Engineer
N/A
Penobscot Snowmobile Club
Advanced Infrastructure Technologies
Brewer, ME
Gardner Construction Enterprises
Contractor
Span
Rise
Width
Skew
Headwall
About
Composite Superstructure
Bangor, ME
44'-6"
6'-10"
12'
0°
When a car drove off the road and struck a nearby snowmobile bridge in Hermon the Penobscot Snowmobile Club chose to replace the former wooden structure with a composite arch bridge. Designed for snowmobile groomer and snow loads this solution proved an economical and durable option for the snowmobile club. The bridge was constructed in four working days. The deck is an 8" roughened reinforced concrete slab.
3 Carbon Fiber Tubes, 5'-6" spacing, 12" diameter